Cache deposits of two inverted vessels, Z59 (left) and Z58 (right), Construction Phase 3a.
Construction Phase 4 features in Squares F, C, and A, view to the south.
Construction Phase 4a showing the step of Zone 23a and intrusive features of the platform (Structure 3), view to south.
Construction Phase 3b, note sherd-lined pit of Z53 in southern section wall, view to south.