Sherd-lined pit after excavation, Construction Phase 5.
Construction Phase 5 showing the chultun of Zone 16 in cross-section, view to south.
Construction Phase 6 (view to north).
Construction Phase 9, showing the depth of excavation during the 1990 season (view to west).