Construction Phase 4a showing the step of Zone 23a and intrusive features of the platform (Structure 3), view to south.
Construction Phase 5 (view to south). Note that north arrow on scale is incorrect.
Cache deposit on inverted Sierra Red: Gadrooned Variety bowl and human remains, Construction Phase 8d.