Construction Phase 3 midden deposit (1992 test unit).
Operation 12 expanded in 1993 to a 6 x 6 meter unit (the earlier 2 x 2 meter square, "Z", is visible in the foreground), view to the north.
View of Structure 28 from the south showing the 1992 screen setup around the test unit.
Location of 1992 test unit at Operation 12 on top of Structure 28 (marked by blue rain tarp) with Structure 26 visible to the left, view to the north.
Notched net weight shaped from sherd.
Notched net sinker shaped from sherd.
Shaped and fired net sinker from surface layer.
Six small beads of fired pottery.
Small sherd disk
Anthropomorphic ocarina, head with zoomorphic headdress.