Construction Phase 1 pit features (1992 test unit).
Construction Phase 4a showing the step of Zone 23a and intrusive features of the platform (Structure 3), view to south.
Construction Phase 4, showing the white plaster floor and two burial cuts on either sides of the unit.
Construction Phase 1 and 2 (view to north) showing Phase 1 pit features (Zones 20 - 23) in southern portion of unit.
Construction Phase 7 (view to north).