Construction Phase 1a showing the northern half of the large, circular firepit (view to south).
Construction Phase 1a showing the large circular firepit in Square B and the original Op. 10 unit (view to south, note baulk wall).
Construction Phase 1b (view to east).
Construction Phase 4 showing base of Zone 10 cache pit.
Construction Phase 4 (view to east) showing Zone 10 floor and top of intrusive cache feature of Zone 10.
Close-up of fire feature (view to east).
Construction Phase 4 (view to north).
Construction Phase 4, showing the white plaster floor and two burial cuts on either sides of the unit.
Construction Phase 4 showing the Zone 5a wall.
Overview of basal platform group in which Operation 10 was located (in background with harvested sugarcane field in foreground, view to north).