Note that Zone 27 depicted in the Phase 5 illustration should be Zone 27a, a surface deposit, and should not be confused with the actual Z27 sherd-lined pit deposit from Phase 4.
This sherd-lined pit is part of Op 12 Z9. (Note that Zone 27a, a surface deposit from Construction Phase 5, should not be confused with this sherd-lined pit deposit from Phase 4.)