Construction Phase 4 features in Squares F, C, and A, view to the south.
Vessel: Sierra Red: Sierra Variety bowl.
Note that Zone 27 depicted in the Phase 5 illustration should be Zone 27a, a surface deposit, and should not be confused with the actual Z27 sherd-lined pit deposit from Phase 4.
Construction Phase 5, Structure 1, view to south.
Construction Phase 6 features, view to north.
Construction Phase 2 pit features (1992 test unit).
Construction Phase 5, exposed in Squares C and D, showing the floor of Zone 11 and a cross-section of chultun feature (Zone 16), view to south.
Construction Phase 1a showing the large circular firepit in Square B and the original Op. 10 unit (view to south, note baulk wall).
Construction Phase 1b showing fire feature (view to north).