0703

Photograph
Operation
Zone(s)
Image content
Vessel number(s)
Comments

Cache deposit of four vessels arranged in a cruciform pattern. Top two north-south vessels (V#029 and V# 030 ) visible in photo and the rim of eastern vessel (V#035) can be seen also, Construction Phase 8c.